Wastewater/Activity/PacpInspection/1.0Mar 8, 2016, 09:32 AM
  • 08 0104_08 0103_08032016_013313.mp4

Date
03/08/2016
W/O
557595
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00015
PipeID
P00152
Time
1:32 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3279
Sewer Name
08 MAIN STREET RELIEF TRUNK
City
GARDENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
04
Purpose
Routine Assessment
Project
WO_557595_TV08024_2016MAR
Sewer Type
GRAVITY
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
08 0104
Downstream MH
08 0103
Dir. of Survey
Downstream
Length Surveyed
645.9 ft.
Total Length
645.9 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2Y00
O&M Rating
256
Overall Index
2
Overall Quick
Overall Rating
256
Pipe schematic from manhole 08 0104 to 08 0103
MH: 08 0104MH: 08 0103downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 08 01040 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COATING 70%41.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"162.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"227.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"284.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"340.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"404.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"525.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"590.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"644.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish645.9 ft. AMH - Downstream Manhole, Survey Ends - 08 0103

Observation photos (1)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
645.9AMH08 0103
41.8TFC
162.5TFC
0MWL
0AMH08 0104
340.1TFC
284.9TFC
2DAGS
590.9TFC
227.3TFC
525.5TFC
404.7TFC
644.1DAGS
2MGOMAG COATING 70%
0MWM

Properties (6)

additional_info
SC305403
custom_field_two
4
customer
LACSD
datetime
2016-03-08T01:32:17-08:00
documentation
PRO PIPE
is_lateral_inspection
false