Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 15, 2016, 11:29 AM
  • 08 0123_08 0122_15032016_042937.mp4

Date
03/15/2016
W/O
557595
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00015
PipeID
P00173
Time
4:29 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3292
Sewer Name
08 MAIN STREET RELIEF TRUNK
City
GARDENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
02
Purpose
Routine Assessment
Project
WO_557595_TV08024_2016MAR
Sewer Type
GRAVITY
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
08 0123
Downstream MH
08 0122
Dir. of Survey
Downstream
Length Surveyed
607 ft.
Total Length
607 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2Y00
O&M Rating
260
Overall Index
2
Overall Quick
Overall Rating
260
Pipe schematic from manhole 08 0123 to 08 0122
MH: 08 0123MH: 08 0122downstream0 ft. AMH - Upstream Manhole, Survey Begins - 08 01230 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start6.4 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES10.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"14.7 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start55.7 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish131.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"188.8 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"253.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"309.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"366.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"431.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"487.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"553.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"607 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish607 ft. AMH - Downstream Manhole, Survey Ends - 08 0122

Observation photos (3)

  • Water Mark, 40 %of cross sectional area

    0 ft. - Water Mark, 40 %of cross sectional area

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Settled Other,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    14.7 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
607DAGS
607AMH08 0122
309.7TFC
0AMH08 0123
0MWM
14.7DSZ
253.6TFC
6.4DSZ
188.8TFA
553.1TFC
431.1TFC
131.8TFC
366.4TFA
0MWL
10.1TFC
55.7DSZ
2DAGS
487.8TFC

Properties (6)

additional_info
SC305416
custom_field_two
4
customer
LACSD
datetime
2016-03-15T04:29:00-07:00
documentation
PRO PIPE
is_lateral_inspection
false