Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 26, 2016, 12:12 PM
  • 02 1511_H 0215_26022016_041344.mp4

Date
02/26/2016
W/O
557579
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00170
PipeID
P11246
Time
4:12 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3270
Sewer Name
H JOINT OUTFALL H - UNIT 2D
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
17
Purpose
Routine Assessment
Project
RFIR_WO_557579_TV02223_2016MAR
Sewer Type
GRAVITY
Material
NRCP
Shape
Circular
Height
21 in.
Upstream MH
02 1511
Downstream MH
H 0215
Dir. of Survey
Downstream
Length Surveyed
17.9 ft.
Total Length
17.9 ft.
Structural Index
3
Structural Quick
3623
Structural Rating
24
O&M Index
2
O&M Quick
2300
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
30
Pipe schematic from manhole 02 1511 to H 0215
MH: 02 1511MH: H 0215downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. AMH - Upstream Manhole, Survey Begins - 02 15112 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 05 to 07 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start17.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish17.1 ft. SAP - Surface Aggregate Projecting, from 05 to 07 o'clock, within 8 inches of joint: YES, Finish17.1 ft. MWL - Water Level, 60 %of cross sectional area17.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish17.1 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish17.9 ft. AMH - Downstream Manhole, Survey Ends - H 0215

Observation photos (7)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 05 to 07 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 05 to 07 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Water Level, 60 %of cross sectional area

    17.1 ft. - Water Level, 60 %of cross sectional area

  • Downstream Manhole, Survey Ends - H 0215

    17.9 ft. - Downstream Manhole, Survey Ends - H 0215

Observations (14)

DistanceCodeObservation
17.1DAGS
0MWL
0MWM
2SAV
17.1SAP
0MGOCOCKROACHES IN MANHOLE
0AMH02 1511
2SAP
2SSS
2DAGS
17.1MWL
17.1SSS
17.9AMHH 0215
17.1SAV

Properties (6)

additional_info
SC225494
custom_field_two
3
customer
LACSD
datetime
2016-02-26T04:12:46-08:00
documentation
PRO PIPE
is_lateral_inspection
false