Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 14, 2017, 06:04 AM
  • 32 0168_32 0167_13092017_230542.mp4

Date
09/13/2017
W/O
651750
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00891
PipeID
P19919
Time
11:04 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4874
Sewer Name
32 VALENCIA TRUNK
City
SANTA CLARITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
08
Purpose
Routine Assessment
Project
WO_651750_TV32044_AUG2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
32 0168
Downstream MH
32 0167
Dir. of Survey
Downstream
Length Surveyed
329 ft.
Total Length
329 ft.
Structural Index
3
Structural Quick
5B3L
Structural Rating
405
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
405
Pipe schematic from manhole 32 0168 to 32 0167
MH: 32 0168MH: 32 0167downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 32 01682.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start5.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start25 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start53.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"103 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish307.7 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"329 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish329 ft. AMH - Downstream Manhole, Survey Ends - 32 0167329 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK329 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    25 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
103SRV
0MWL
329SSS
307.7TF
329AMH32 0167
329MGOCONNECTION AT MH 3 O'CLOCK
25SRV
0MWM
329SAP
53.3TFA
2.1SSS
0AMH32 0168
5.5SAP

Properties (7)

additional_info
SC345933
custom_field_two
2
customer
LACSD
datetime
2017-09-13T23:04:52-07:00
documentation
PROPIPE
is_lateral_inspection
false
year_laid
26793