Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 6, 2015, 12:28 PM
  • 14 0051_14 0050_06042015_065606.mp4

Date
04/06/2015
W/O
497182
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00577
PipeID
P18063
Time
5:28 AM
Certificate
U-109-7948
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K2461
Sewer Name
14 TRUNK "A"
City
PALMDALE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
04
Purpose
Routine Assessment
Project
WO_497182_TV14018_2015MARCH
Sewer Type
GRAVITY
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
14 0051
Downstream MH
14 0050
Dir. of Survey
Downstream
Length Surveyed
281.4 ft.
Total Length
281.4 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
4
Overall Quick
Overall Rating
4
Pipe schematic from manhole 14 0051 to 14 0050
MH: 14 0051MH: 14 0050downstream0 ft. MWM - Water Mark, 60 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 00510 ft. MWL - Water Level, 25 %of cross sectional area2 ft. MGO - General Observation - Magnesium hydroxide coating 30% start82.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"145.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"186.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"277.7 ft. MGO - General Observation - Magnesium hydroxide coating 30% finish281.4 ft. AMH - Downstream Manhole, Survey Ends - 14 0050281.4 ft. MGO - General Observation - CONNECTION AT THE MH 3 O' CLOCK CAPPED

Observations (10)

DistanceCodeObservation
145.9TFC
186.6TFC
281.4AMH14 0050
2MGOMagnesium hydroxide coating 30% start
0MWM
0AMH14 0051
277.7MGOMagnesium hydroxide coating 30% finish
281.4MGOCONNECTION AT THE MH 3 O' CLOCK CAPPED
0MWL
82.5TFC

Properties (6)

additional_info
SC207746
custom_field_two
4
customer
LACSD
datetime
2015-04-06T05:28:14-07:00
documentation
PRO PIPE
is_lateral_inspection
false