Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 16, 2015, 06:20 AM
  • 14 0054_14 0053_16042015_010807.mp4

Date
04/15/2015
W/O
497182
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00577
PipeID
P18066
Time
11:20 PM
Certificate
U-109-7948
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K2470
Sewer Name
14 TRUNK "A"
City
LANCASTER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
04
Purpose
Routine Assessment
Project
WO_497182_TV14018_2015MARCH
Sewer Type
GRAVITY
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
14 0054
Downstream MH
14 0053
Dir. of Survey
Downstream
Length Surveyed
500.2 ft.
Total Length
500.2 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
4
Overall Quick
Overall Rating
4
Pipe schematic from manhole 14 0054 to 14 0053
MH: 14 0054MH: 14 0053downstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 00540 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MWM - Water Mark, 55 %of cross sectional area0 ft. MGO - General Observation - Magnesium hydroxide coating 50% start14.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"37.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"62.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"109.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"134 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"157.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"206.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"229.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"253.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"277.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"302.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"325.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"349.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"430.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"453.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"497.6 ft. MGO - General Observation - Magnesium hydroxide coating 50% finish500.2 ft. AMH - Downstream Manhole, Survey Ends - 14 0053

Observations (21)

DistanceCodeObservation
0AMH14 0054
0MWL
302.3TFC
500.2AMH14 0053
430.9TFC
109.6TFC
134TFC
37.9TFC
497.6MGOMagnesium hydroxide coating 50% finish
277.8TFC
325.8TFC
157.5TFC
229.6TFC
62.2TFC
206.1TFC
349.6TFC
0MWM
14.8TFC
453.3TFC
0MGOMagnesium hydroxide coating 50% start
253.5TFC

Properties (6)

additional_info
SC201206
custom_field_two
4
customer
LACSD
datetime
2015-04-15T23:20:01-07:00
documentation
PRO PIPE
is_lateral_inspection
false