Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 14, 2015, 09:54 AM
  • 14 0060_14 0059_14042015_043219.mp4

Date
04/14/2015
W/O
497182
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00577
PipeID
P18072
Time
2:54 AM
Certificate
U-109-7948
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K2468
Sewer Name
14 TRUNK "A"
City
LANCASTER
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
04
Purpose
Routine Assessment
Project
WO_497182_TV14018_2015MARCH
Sewer Type
GRAVITY
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
14 0060
Downstream MH
14 0059
Dir. of Survey
Downstream
Length Surveyed
199.2 ft.
Total Length
199.2 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
4
Overall Quick
Overall Rating
4
Pipe schematic from manhole 14 0060 to 14 0059
MH: 14 0060MH: 14 0059downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MGO - General Observation - Magnesium hydroxide coating 40% start0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 006038.7 ft. MGO - General Observation - Magnesium hydroxide coating 40% finish40.7 ft. MGO - General Observation - CONNECTION AT THE MH 9 O' CLOCK40.7 ft. MGO - General Observation - UNMAPPED MH87.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"99.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"123.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"148 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"172 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"196.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"199.2 ft. AMH - Downstream Manhole, Survey Ends - 14 0059

Observations (14)

DistanceCodeObservation
38.7MGOMagnesium hydroxide coating 40% finish
199.2AMH14 0059
0MWM
123.9TFC
196.2TFC
40.7MGOCONNECTION AT THE MH 9 O' CLOCK
40.7MGOUNMAPPED MH
0MGOMagnesium hydroxide coating 40% start
0MWL
99.9TFC
87.2TFC
172TFC
0AMH14 0060
148TFC

Properties (6)

additional_info
SC201204
custom_field_two
4
customer
LACSD
datetime
2015-04-14T02:54:25-07:00
documentation
PRO PIPE
is_lateral_inspection
false