Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 27, 2017, 08:57 AM
  • 05 1711_05 1710_11272017_045151.mp4

Date
11/27/2017
W/O
0674089
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00471
PipeID
P06938
Time
12:57 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0683
Sewer Name
05 LOMITA TRUNK
City
LOMITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
33
Purpose
Capital Improvement Program Assesment
Project
20171127MDM_LOMITA_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Upstream MH
05 1711
Downstream MH
05 1710
Dir. of Survey
Downstream
Length Surveyed
310.8 ft.
Total Length
310.8 ft.
Structural Index
2
Structural Quick
352A
Structural Rating
39
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
39
Pipe schematic from manhole 05 1711 to 05 1710
MH: 05 1711MH: 05 1710downstream0 ft. AMH - Upstream Manhole, Survey Begins - 4:40AM0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Capped0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active0 ft. MWL - Water Level, 10 %of cross sectional area3.9 ft. FC - Fracture Circumferential, from 08 to 04 o'clock, within 8 inches of joint: YES - SL3.9 ft. FS - Fracture Spiral, from 01 to 05 o'clock, within 8 inches of joint: YES, Start - SLIGHT3.9 ft. FS - Fracture Spiral, from 07 to 11 o'clock, within 8 inches of joint: YES, Start - SLIGHT18.7 ft. FC - Fracture Circumferential, from 02 to 04 o'clock, within 8 inches of joint: YES - HAIRLINE28.4 ft. FC - Fracture Circumferential, from 08 to 10 o'clock, within 8 inches of joint: YES - SL31.2 ft. FC - Fracture Circumferential, from 11 to 02 o'clock, within 8 inches of joint: YES - H52.7 ft. FC - Fracture Circumferential, from 12 to 03 o'clock, within 8 inches of joint: YES - SL109.9 ft. FS - Fracture Spiral, from 07 to 11 o'clock, within 8 inches of joint: YES - SL116.4 ft. FS - Fracture Spiral, from 07 to 11 o'clock, within 8 inches of joint: YES - SL143.4 ft. FC - Fracture Circumferential, from 09 to 11 o'clock, within 8 inches of joint: YES - H149.1 ft. FC - Fracture Circumferential, from 08 to 11 o'clock, within 8 inches of joint: YES - SL176.3 ft. FC - Fracture Circumferential, from 03 to 04 o'clock, within 8 inches of joint: YES - SL190 ft. FC - Fracture Circumferential, from 04 to 05 o'clock, within 8 inches of joint: YES - H210 ft. FS - Fracture Spiral, from 01 to 05 o'clock, within 8 inches of joint: YES - SLIGHT255.2 ft. FC - Fracture Circumferential, from 02 to 04 o'clock, within 8 inches of joint: YES - SL267.5 ft. FC - Fracture Circumferential, from 12 to 02 o'clock, within 8 inches of joint: YES - H267.5 ft. FC - Fracture Circumferential, from 10 to 12 o'clock, within 8 inches of joint: YES - SL310.6 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active310.6 ft. FS - Fracture Spiral, from 07 to 11 o'clock, within 8 inches of joint: YES, Finish - SLIGHT310.6 ft. FS - Fracture Spiral, from 01 to 05 o'clock, within 8 inches of joint: YES, Finish - SLIGHT310.8 ft. AMH - Downstream Manhole, Survey Ends - 5:10AM

Observation photos (5)

  • Fracture Spiral, from 01 to 05 o'clock, within 8 inches of joint: YES, Start - SLIGHT

    3.9 ft. - Fracture Spiral, from 01 to 05 o'clock, within 8 inches of joint: YES, Start - SLIGHT

  • Fracture Spiral, from 07 to 11 o'clock, within 8 inches of joint: YES, Start - SLIGHT

    3.9 ft. - Fracture Spiral, from 07 to 11 o'clock, within 8 inches of joint: YES, Start - SLIGHT

  • Fracture Spiral, from 07 to 11 o'clock, within 8 inches of joint: YES - SL

    109.9 ft. - Fracture Spiral, from 07 to 11 o'clock, within 8 inches of joint: YES - SL

  • Fracture Spiral, from 07 to 11 o'clock, within 8 inches of joint: YES - SL

    116.4 ft. - Fracture Spiral, from 07 to 11 o'clock, within 8 inches of joint: YES - SL

  • Fracture Spiral, from 01 to 05 o'clock, within 8 inches of joint: YES - SLIGHT

    210 ft. - Fracture Spiral, from 01 to 05 o'clock, within 8 inches of joint: YES - SLIGHT

Observations (26)

DistanceCodeObservation
0AMH4:40AM
0MGOConn. @ Mh, 9 O' Clock. Capped
210FSSLIGHT
116.4FSSL
18.7FCHAIRLINE
267.5FCH
3.9FCSL
3.9FSSLIGHT
310.6MGOConn. @ Mh, 9 O' Clock. Active
52.7FCSL
28.4FCSL
3.9FSSLIGHT
310.6FSSLIGHT
255.2FCSL
267.5FCSL
0MWM
31.2FCH
143.4FCH
310.8AMH5:10AM
310.6FSSLIGHT
0MGOConn. @ Mh, 3 O' Clock. Active
0MWL
149.1FCSL
109.9FSSL
190FCH
176.3FCSL

Properties (6)

custom_field_three
SLIGHT SPRIAL FRACTURE JOINT TO JOINT LONGER
custom_field_two
2
customer
LACSD
datetime
2017-11-27T00:57:53-08:00
documentation
MARTIN,REVELES,OLIVER 111
is_lateral_inspection
false