Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 21, 2017, 08:33 AM
  • 18 0209_18 0208_11212017_010332.mp4

Date
11/21/2017
W/O
0674937
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00695
PipeID
P14034
Time
12:33 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
HO675
Sewer Name
18 ORR AND DAY ROAD TRUNK
City
SANTE FE SPRINGS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
13
Purpose
Maintenance Related
Project
20171121MDM_ORR_AND_ROAD_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
18 0209
Downstream MH
18 0208
Dir. of Survey
Downstream
Length Surveyed
21 ft.
Total Length
21 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
3
O&M Quick
4132
O&M Rating
12
Overall Index
3
Overall Quick
Overall Rating
12
Pipe schematic from manhole 18 0209 to 18 0208
MH: 18 0209MH: 18 0208downstream0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active0 ft. AMH - Upstream Manhole, Survey Begins - 12:35AM0 ft. MWM - Water Mark, 70 %of cross sectional area8 ft. MGO - General Observation - 27" RCP8.6 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO - POSSIBLE ROCK9.5 ft. DSC - Deposits Settled Compacted, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - HARD MATERIAL UNDER FLOW LEFT SIDE OF PIPE20.6 ft. DSC - Deposits Settled Compacted, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - DEBRIE UNDER FLOW HARD MATERIAL20.8 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO - HARD MATERIAL UNDER FLOW21 ft. MSA - Survey Abandoned - 20% HARD MATERIAL UNDER FLOW

Observation photos (2)

  • General Observation - 27" RCP

    8 ft. - General Observation - 27" RCP

  • Deposits Settled Compacted,  15 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start - HARD MATERIAL UNDER FLOW LEFT SIDE OF PIPE

    9.5 ft. - Deposits Settled Compacted, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - HARD MATERIAL UNDER FLOW LEFT SIDE OF PIPE

Observations (10)

DistanceCodeObservation
9.5DSCHARD MATERIAL UNDER FLOW LEFT SIDE OF PIPE
0MWL
8.6DSZPOSSIBLE ROCK
20.6DSCDEBRIE UNDER FLOW HARD MATERIAL
0MGOConn. @ Mh, 3 O' Clock. Active
0AMH12:35AM
0MWM
8MGO27" RCP
20.8DSZHARD MATERIAL UNDER FLOW
21MSA20% HARD MATERIAL UNDER FLOW

Properties (5)

additional_info
POSSIBLE DEBRIE 20' DOWNSTREAM
customer
LACSD
datetime
2017-11-21T00:33:42-08:00
documentation
MARTIN,MANANES,REVELES
is_lateral_inspection
false