Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 6, 2018, 08:35 AM
  • 32 1004_32 1003 _06042018_014841.mp4

Date
04/06/2018
W/O
690713
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00841
PipeID
P19450
Time
1:35 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5563
Sewer Name
32 SOLEDAD CANYON TRUNK, SECTS 1,2,3,&4
City
SANTA CLARITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
09
Purpose
Routine Assessment
Project
WO_690713_TV32049_MAR2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
32 1004
Downstream MH
32 1003
Dir. of Survey
Downstream
Length Surveyed
353.2 ft.
Total Length
353.2 ft.
Structural Index
3
Structural Quick
3M22
Structural Rating
214
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
214
Pipe schematic from manhole 32 1004 to 32 1003
MH: 32 1004MH: 32 1003downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 32 10040 ft. MWM - Water Mark, 40 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start107.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start352 ft. MGO - General Observation - MAG COAT FROM 09 TO 03 O'CLOCK, 50% THROUGHOUT THE REACH353.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish353.2 ft. AMH - Downstream Manhole, Survey Ends - 32 1003353.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    107.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
0MWL
352MGOMAG COAT FROM 09 TO 03 O'CLOCK, 50% THROUGHOUT THE REACH
0AMH32 1004
353.2SSS
353.2AMH32 1003
107.5SSS
2SAP
0MWM
353.2SAP

Properties (6)

additional_info
SC358522
custom_field_two
3
customer
LACSD
datetime
2018-04-06T01:35:41-07:00
documentation
PRO PIPE
is_lateral_inspection
false