Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 26, 2018, 11:18 AM
  • 04 0036_04 0035_26032018_042942.mp4

Date
03/26/2018
W/O
690446
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00416
PipeID
P11764
Time
4:18 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5498
Sewer Name
04 SHERMAN RELIEF TRUNK
City
WEST HOLLYWOOD
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 04
Page No.
01
Purpose
Routine Assessment
Project
WO_690446_TV04026_MAR2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
04 0035
Downstream MH
04 0036
Dir. of Survey
Upstream
Length Surveyed
129 ft.
Total Length
129 ft.
Structural Index
3
Structural Quick
3D00
Structural Rating
75
O&M Index
3
O&M Quick
413C
O&M Rating
61
Overall Index
3
Overall Quick
Overall Rating
136
Pipe schematic from manhole 04 0035 to 04 0036
MH: 04 0035MH: 04 0036upstream0 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish0 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish0 ft. AMH - Upstream Manhole, Survey Ends - 04 003696.7 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS124.3 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start128.6 ft. MWM - Water Mark, 50 %of cross sectional area129 ft. MWL - Water Level, 25 %of cross sectional area129 ft. AMH - Downstream Manhole, Survey Begins - 04 0035

Observation photos (1)

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    4.7 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (8)

DistanceCodeObservation
129SAV
4.7SAV
0.4MWM
129DSZ
0MWL
32.3DSZDEBRIS
129AMH04 0036
0AMH04 0035

Properties (6)

additional_info
SC358506, PROJECT BAR SHOULD SAY NRCP INSTEAD OF VCP
custom_field_two
3
customer
LACSD
datetime
2018-03-26T04:18:45-07:00
documentation
PRO PIPE
is_lateral_inspection
false