Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 9, 2016, 06:08 PM
  • 22 0667_22 0666_20160509_122346.mp4

Date
05/09/2016
W/O
568953
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00827
PipeID
P17016
Time
11:08 AM
Certificate
U-507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3247
Sewer Name
22 SUNFLOWER TRUNK
City
SAN DIMAS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
22
Purpose
Routine Assessment
Project
WO_568953_TV22063_MAY2016
Sewer Type
GRAVITY
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
22 0667
Downstream MH
22 0666
Dir. of Survey
Downstream
Length Surveyed
306.8 ft.
Total Length
306.8 ft.
Structural Index
3
Structural Quick
3200
Structural Rating
6
O&M Index
2
O&M Quick
412K
O&M Rating
126
Overall Index
2
Overall Quick
Overall Rating
132
Pipe schematic from manhole 22 0667 to 22 0666
MH: 22 0667MH: 22 0666downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 06670 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start3.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start3.9 ft. MGO - General Observation - Magnesium hydroxide coating start17.9 ft. RBC - Roots Ball Connection, from 11 to 01 o'clock, 55 %, within 8 inches of joint: YES17.9 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 4"28.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"33.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"82.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"87.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"156.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"161.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"227.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4", 4"231.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"289.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"296.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"304 ft. SAV - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish306.5 ft. MGO - General Observation - Magnesium hydroxide coating finish306.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish306.8 ft. AMH - Downstream Manhole, Survey Ends - 22 0666

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    3.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Roots Ball Connection, from 11 to 01 o'clock, 55 %, within 8 inches of joint: YES

    17.9 ft. - Roots Ball Connection, from 11 to 01 o'clock, 55 %, within 8 inches of joint: YES

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Finish

    306.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish

Observations (22)

DistanceCodeObservation
2SAV
227.1TFC
0AMH22 0667
3.9DAGS
306.8AMH22 0666
28.7TFC
33.4TFC
304SAV
156.6TFC
0MWL
306.5MGOMagnesium hydroxide coating finish
17.9RBC
17.9TFA
306.5DAGS
87.9TFC
231.6TFC
289.9TFC
3.9MGOMagnesium hydroxide coating start
296.5TFC
0MWM
82.9TFC
161.6TFC

Properties (6)

additional_info
SC305346
custom_field_two
3
customer
LACSD
datetime
2016-05-09T11:08:08-07:00
documentation
PRO PIPE
is_lateral_inspection
false