Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 9, 2016, 04:57 PM
  • 22 0670_22 0669_20160509_111633.mp4

Date
05/09/2016
W/O
568953
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00827
PipeID
P17019
Time
9:57 AM
Certificate
U-507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3247
Sewer Name
22 SUNFLOWER TRUNK
City
SAN DIMAS
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
22
Purpose
Routine Assessment
Project
WO_568953_TV22063_MAY2016
Sewer Type
GRAVITY
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
22 0670
Downstream MH
22 0669
Dir. of Survey
Downstream
Length Surveyed
389.3 ft.
Total Length
389.3 ft.
Structural Index
3
Structural Quick
3N2N
Structural Rating
385
O&M Index
2
O&M Quick
2N00
O&M Rating
150
Overall Index
2
Overall Quick
Overall Rating
535
Pipe schematic from manhole 22 0670 to 22 0669
MH: 22 0670MH: 22 0669downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 06700 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. MGO - General Observation - Magnesium hydroxide coating start2 ft. SAV - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Start12.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start38.4 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"39 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"55.1 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"105.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"110.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"185.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"189.8 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"264.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"270.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"339.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"344.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"386 ft. SAV - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish386 ft. SSS - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish386.4 ft. MGO - General Observation - Magnesium hydroxide coating finish386.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish389.3 ft. AMH - Downstream Manhole, Survey Ends - 22 0669

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    12.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"

    38.4 ft. - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"

Observations (23)

DistanceCodeObservation
386.4MGOMagnesium hydroxide coating finish
0AMH22 0670
189.8TFA
0MWL
38.4TBA
270.6TFC
389.3AMH22 0669
12.4DAGS
0MWM
55.1TFA
386SAV
386SSS
2MGOMagnesium hydroxide coating start
105.6TFC
264.9TFC
2SAV
339.1TFC
344.8TFC
386.4DAGS
110.8TFC
185.2TFC
2SSS
39TFC

Properties (6)

additional_info
SC305346
custom_field_two
3
customer
LACSD
datetime
2016-05-09T09:57:13-07:00
documentation
PRO PIPE
is_lateral_inspection
false