22 0642_22 0641_20160511_232908.mp4
0 ft. - Water Level, 15 %of cross sectional area
0 ft. - General Observation - CONNECTION AT THE MH 9 O'CLOCK

0.6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
1.9 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - General Observation - Magnesium hydroxide coating 10% start
35.7 ft. - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES
39 ft. - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"
95 ft. - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"
317.8 ft. - Water Level, Sag in pipe, 5 %of cross sectional area, Start
324.4 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish
| Distance | Code | Observation |
|---|---|---|
| 325.2 | AMH | 22 0641 |
| 0 | MWL | — |
| 317.8 | MWLS | — |
| 0 | AMH | 22 0642 |
| 35.7 | CL | — |
| 39 | TFA | — |
| 243.8 | TFC | — |
| 0.6 | DAGS | — |
| 95 | TFA | — |
| 2 | MGO | Magnesium hydroxide coating 10% start |
| 324.4 | MGO | Magnesium hydroxide coating finish |
| 324.4 | MWLS | — |
| 324.4 | SAV | — |
| 1.9 | SAV | — |
| 324.4 | DAGS | — |
| 0 | MWM | — |
| 0 | MGO | CONNECTION AT THE MH 9 O'CLOCK |
| 0 | VC | — |
| 179.7 | TFA | — |
| 239.7 | TFC | — |