22 0630_22 0629_20160512_034933.mp4
0 ft. - Upstream Manhole, Survey Begins - 22 0630
0 ft. - Water Level, 5 %of cross sectional area
2 ft. - General Observation - Magnesium hydroxide coating 85% start

3.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
31.3 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"
135.4 ft. - Roots Fine Lateral, at 02 o'clock
179.7 ft. - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"
362.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish
366.1 ft. - General Observation - CONNECTION AT THE MH 3 O'CLOCK
| Distance | Code | Observation |
|---|---|---|
| 2 | SAV | — |
| 10.9 | TFA | — |
| 123.7 | TFA | — |
| 0 | AMH | 22 0630 |
| 135.4 | TFA | — |
| 364 | SAV | — |
| 0 | MWL | — |
| 240.2 | TFA | — |
| 71.2 | TFC | — |
| 31.3 | TFC | — |
| 3.9 | DAGS | — |
| 366.1 | MGO | CONNECTION AT THE MH 3 O'CLOCK |
| 135.4 | RFL | — |
| 260.4 | TFA | — |
| 366.1 | AMH | 22 0629 |
| 52.9 | TFA | — |
| 0 | MWM | — |
| 328.9 | TFC | — |
| 362.9 | DAGS | — |
| 199.7 | TFA | — |
| 291.4 | TFC | — |
| 179.7 | TFA | — |
| 362.9 | MGO | Magnesium hydroxide coating finish |
| 2 | MGO | Magnesium hydroxide coating 85% start |
| 75 | TFC | — |