22 0635_22 0634_20160512_015419.mp4
0 ft. - Upstream Manhole, Survey Begins - 22 0635
2 ft. - General Observation - Magnesium hydroxide coating 85% start
7.7 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
82 ft. - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"
86.2 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"
230.9 ft. - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"
259 ft. - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"
| Distance | Code | Observation |
|---|---|---|
| 0 | MWM | — |
| 230.9 | TFA | — |
| 2 | MGO | Magnesium hydroxide coating 85% start |
| 121.9 | TFC | — |
| 0 | MGO | CONNECTION AT THE MH 6 O'CLOCK |
| 360 | SAV | — |
| 82 | TFA | — |
| 0 | AMH | 22 0635 |
| 7.7 | DAGS | — |
| 126.8 | TFC | — |
| 235 | TFA | — |
| 361.9 | DAGS | — |
| 283.3 | TFA | — |
| 86.2 | TFC | — |
| 364.6 | AMH | 22 0634 |
| 0 | MWL | — |
| 2 | SAV | — |
| 331.7 | TFA | — |
| 336.3 | TFA | — |
| 259 | TFA | — |