Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 12, 2016, 08:12 AM
  • 22 0633_22 0632_20160512_023240.mp4

Date
05/12/2016
W/O
568953
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00827
PipeID
P16981
Time
1:12 AM
Certificate
U-507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3249
Sewer Name
22 SUNFLOWER TRUNK
City
GLENDORA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
22
Purpose
Routine Assessment
Project
WO_568953_TV22063_MAY2016
Sewer Type
GRAVITY
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
22 0633
Downstream MH
22 0632
Dir. of Survey
Downstream
Length Surveyed
365.6 ft.
Total Length
365.6 ft.
Structural Index
3
Structural Quick
3M00
Structural Rating
216
O&M Index
2
O&M Quick
2M11
O&M Rating
145
Overall Index
2
Overall Quick
Overall Rating
361
Pipe schematic from manhole 22 0633 to 22 0632
MH: 22 0633MH: 22 0632downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 06330.1 ft. VC - Vermin Cockroach2 ft. SAV - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - Magnesium hydroxide coating 85% start4.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start18.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"48.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"70.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"119 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"142.8 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"169.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"198 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"219.8 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"244 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"256.7 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"263.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"284.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"297.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"321.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"345.2 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"352.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"363.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish363.6 ft. MGO - General Observation - Magnesium hydroxide coating finish364 ft. SAV - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish365.6 ft. AMH - Downstream Manhole, Survey Ends - 22 0632

Observation photos (5)

  • Upstream Manhole, Survey Begins - 22 0633

    0 ft. - Upstream Manhole, Survey Begins - 22 0633

  • General Observation - Magnesium hydroxide coating 85% start

    2 ft. - General Observation - Magnesium hydroxide coating 85% start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    4.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"

    70.4 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"

  • Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"

    169.1 ft. - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"

Observations (27)

DistanceCodeObservation
0MWM
365.6AMH22 0632
48.4TFA
18.2TFA
119TFA
2SAV
345.2TFA
0.1VC
297.3TFC
142.8TFA
198TFA
4.2DAGS
256.7TBA
352.6TFC
244TFC
0MWL
0AMH22 0633
70.4TFC
363.3DAGS
263.9TFC
284.2TFC
321.1TFA
219.8TFA
169.1TFA
2MGOMagnesium hydroxide coating 85% start
364SAV
363.6MGOMagnesium hydroxide coating finish

Properties (6)

additional_info
SC305348
custom_field_two
3
customer
LACSD
datetime
2016-05-12T01:12:25-07:00
documentation
PRO PIPE
is_lateral_inspection
false