Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 12, 2016, 07:12 PM
  • 22 0618_22 0617_20160512_132722.mp4

Date
05/12/2016
W/O
568953
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00827
PipeID
P16966
Time
12:12 PM
Certificate
U-507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3250
Sewer Name
22 SUNFLOWER TRUNK
City
GLENDORA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
21
Purpose
Routine Assessment
Project
WO_568953_TV22063_MAY2016
Sewer Type
GRAVITY
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
22 0618
Downstream MH
22 0617
Dir. of Survey
Downstream
Length Surveyed
210.5 ft.
Total Length
210.5 ft.
Structural Index
3
Structural Quick
3300
Structural Rating
9
O&M Index
2
O&M Quick
2300
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
15
Pipe schematic from manhole 22 0618 to 22 0617
MH: 22 0618MH: 22 0617downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - Magnesium hydroxide coating 15% start0 ft. MGO - General Observation - CONNECTION AT THE MH 9 O'CLOCK0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 06172 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start4.2 ft. CM - Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES22.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"34.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4", 4"86.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"90 ft. TBI - Tap Break-In Intruding, at 02 o'clock, -, #v, within 8 inches of joint: NO, 4", 1"134.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"181.9 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"181.9 ft. TFA - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: YES, 4"190 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"198.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"207.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish207.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish210.5 ft. AMH - Downstream Manhole, Survey Ends - 22 0617

Observation photos (6)

  • Water Level, 10 %of cross sectional area

    0 ft. - Water Level, 10 %of cross sectional area

  • General Observation - Magnesium hydroxide coating 15% start

    0 ft. - General Observation - Magnesium hydroxide coating 15% start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    4.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Tap Break-In Intruding, at 02 o'clock, -, #v, within 8 inches of joint: NO, 4", 1"

    90 ft. - Tap Break-In Intruding, at 02 o'clock, -, #v, within 8 inches of joint: NO, 4", 1"

  • Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: YES, 4"

    181.9 ft. - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: YES, 4"

Observations (20)

DistanceCodeObservation
190TFC
0MWL
0MGOMagnesium hydroxide coating 15% start
4.2DAGS
134.6TFC
90TBI
210.5AMH22 0617
0MGOCONNECTION AT THE MH 9 O'CLOCK
181.9TFA
0MWM
0AMH22 0617
34.9TFA
181.9TFA
4.2CM
2SAP
207.9DAGS
198.2TFA
22.4TFC
207.9SAP
86.3TFC

Properties (6)

additional_info
SC305349
custom_field_two
3
customer
LACSD
datetime
2016-05-12T12:12:17-07:00
documentation
PRO PIPE
is_lateral_inspection
false