Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 10, 2016, 10:14 AM
  • 22 0659_22 0658_20160510_042929.mp4

Date
05/10/2016
W/O
568953
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00827
PipeID
P17007
Time
3:14 AM
Certificate
U-507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3247
Sewer Name
22 SUNFLOWER TRUNK
City
SAN DIMAS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
22
Purpose
Routine Assessment
Project
WO_568953_TV22063_MAY2016
Sewer Type
GRAVITY
Material
NRCP
Shape
Circular
Height
12 in.
Upstream MH
22 0659
Downstream MH
22 0658
Dir. of Survey
Downstream
Length Surveyed
268.2 ft.
Total Length
268.2 ft.
Structural Index
3
Structural Quick
3J00
Structural Rating
159
O&M Index
2
O&M Quick
2212
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
165
Pipe schematic from manhole 22 0659 to 22 0658
MH: 22 0659MH: 22 0658downstream0 ft. MGO - General Observation - CONNECTION AT THE MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 22 06590 ft. MWL - Water Level, 10 %of cross sectional area0 ft. VC - Vermin Cockroach0 ft. MWM - Water Mark, 15 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - Magnesium hydroxide coating start4.5 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start18 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"118.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"167 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"219.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"247.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"265.5 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish265.5 ft. MGO - General Observation - Magnesium hydroxide coating finish266 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish268.2 ft. AMH - Downstream Manhole, Survey Ends - 22 0658268.2 ft. VC - Vermin Cockroach, within 8 inches of joint: NO268.2 ft. MGO - General Observation - CONNECTION AT THE MH 3 O'CLOCK

Observation photos (2)

  • Water Mark, 15 %of cross sectional area

    0 ft. - Water Mark, 15 %of cross sectional area

  • Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    4.5 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
268.2AMH22 0658
268.2VC
268.2MGOCONNECTION AT THE MH 3 O'CLOCK
265.5DAGS
18TFA
4.5DAGS
247.2TFC
266SAV
0MGOCONNECTION AT THE MH 3 O'CLOCK
0AMH22 0659
118.4TFA
0MWL
2SAV
0VC
219.1TFA
167TFA
2MGOMagnesium hydroxide coating start
0MWM
265.5MGOMagnesium hydroxide coating finish

Properties (6)

additional_info
SC305346
custom_field_two
3
customer
LACSD
datetime
2016-05-10T03:14:03-07:00
documentation
PRO PIPE
is_lateral_inspection
false