Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 10, 2016, 10:33 AM
  • 22 0658_22 0657_20160510_045026.mp4

Date
05/10/2016
W/O
568953
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00827
PipeID
P17006
Time
3:33 AM
Certificate
U-507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3247
Sewer Name
22 SUNFLOWER TRUNK
City
SAN DIMAS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
22
Purpose
Routine Assessment
Project
WO_568953_TV22063_MAY2016
Sewer Type
GRAVITY
Material
NRCP
Shape
Circular
Height
12 in.
Upstream MH
22 0658
Downstream MH
22 0657
Dir. of Survey
Downstream
Length Surveyed
309.1 ft.
Total Length
309.1 ft.
Structural Index
3
Structural Quick
3K00
Structural Rating
183
O&M Index
2
O&M Quick
2212
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
189
Pipe schematic from manhole 22 0658 to 22 0657
MH: 22 0658MH: 22 0657downstream0 ft. MGO - General Observation - CONNECTION AT THE MH 3 O'CLOCK0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. VC - Vermin Cockroach0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 06582 ft. SAV - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - Magnesium hydroxide coating start3.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start110.2 ft. RFJ - Roots Fine Joint, at 08 o'clock, within 8 inches of joint: YESR144 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"148 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"154 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"272.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"306.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish306.2 ft. MGO - General Observation - Magnesium hydroxide coating finish307 ft. SAV - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish309.1 ft. AMH - Downstream Manhole, Survey Ends - 22 0657

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    3.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Roots Fine Joint, at 08 o'clock, within 8 inches of joint: YESR

    110.2 ft. - Roots Fine Joint, at 08 o'clock, within 8 inches of joint: YESR

Observations (17)

DistanceCodeObservation
0MGOCONNECTION AT THE MH 3 O'CLOCK
306.2DAGS
0MWL
3.4DAGS
306.2MGOMagnesium hydroxide coating finish
148TFC
154TFA
0VC
309.1AMH22 0657
144TFC
0MWM
2SAV
0AMH22 0658
307SAV
272.3TFC
110.2RFJ
2MGOMagnesium hydroxide coating start

Properties (6)

additional_info
SC305346
custom_field_two
3
customer
LACSD
datetime
2016-05-10T03:33:11-07:00
documentation
PRO PIPE
is_lateral_inspection
false