05 2286_05 2285 _26092017_001628.mp4
2.3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
6.9 ft. - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: YES, 4"
107.4 ft. - Broken, from 03 to 06 o'clock, within 8 inches of joint: YES
121.2 ft. - Fracture Multiple, from 08 to 02 o'clock, within 8 inches of joint: YES
286.9 ft. - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES
364.9 ft. - Obstacles Other, 10 %of cross sectional area, from 04 to 08 o'clock - DEBRIS
374.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish
| Distance | Code | Observation |
|---|---|---|
| 377 | AMH | 05 2285 |
| 2.3 | DAGS | — |
| 374.9 | MGO | MAG COAT FINISH |
| 0 | MWL | — |
| 121.2 | FM | — |
| 6.9 | TFA | — |
| 364.9 | OBZ | DEBRIS |
| 0 | MWM | — |
| 374.9 | DAGS | — |
| 107.4 | B | — |
| 0 | AMH | 05 2286 |
| 5.1 | MGO | MAG COAT START |
| 286.9 | CL | — |