Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 18, 2017, 12:45 AM
  • H 0192_H 0191 _031417_041318.mp4

Date
02/17/2017
W/O
1590881
Weather
Dry
Operator/Surveyor
JUAN B
Sewer ID
Z00169
PipeID
P11216
Time
4:45 PM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4321
Sewer Name
H JOINT OUTFALL H - UNIT 2C
City
BELL GARDENS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
23
Purpose
Routine Assessment
Project
WO_624328_TV02168_MAR2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
H 0192
Downstream MH
H 0191
Dir. of Survey
Downstream
Length Surveyed
490.6 ft.
Total Length
490.6 ft.
Structural Index
1
Structural Quick
1R00
Structural Rating
96
O&M Index
2
O&M Quick
2R00
O&M Rating
192
Overall Index
2
Overall Quick
Overall Rating
288
Pipe schematic from manhole H 0192 to H 0191
MH: H 0192MH: H 0191downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 01920 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area8.1 ft. SRI - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start8.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start8.1 ft. MGO - General Observation - MAG COATING490.1 ft. SRI - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish490.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish490.6 ft. AMH - Downstream Manhole, Survey Ends - H 0191

Observation photos (2)

  • Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    8.1 ft. - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    8.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
490.6AMHH 0191
8.1SRI
0AMHH 0192
490.1SRI
0MWM
0MWL
8.1DAGS
8.1MGOMAG COATING
490.1DAGS

Properties (6)

additional_info
SC318735
custom_field_two
5
customer
LACSD
datetime
2017-02-17T16:45:03-08:00
documentation
PROPIPE
is_lateral_inspection
false