Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 12, 2016, 09:15 AM
  • 02 0363_02 0362 _20160812_032909.mp4

Date
08/12/2016
W/O
252431
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00250
PipeID
P02677
Time
2:15 AM
Certificate
U-507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3681
Sewer Name
02 DOWNEY AVENUE EXTENSION TRUNK
City
BELLFLOWER, CA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
38
Purpose
Routine Assessment
Project
WO_252431_TV02049_AUG2016
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
02 0363
Downstream MH
02 0362
Dir. of Survey
Downstream
Length Surveyed
303.7 ft.
Total Length
303.7 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
1
O&M Quick
1100
O&M Rating
1
Overall Index
2
Overall Quick
Overall Rating
4
Pipe schematic from manhole 02 0363 to 02 0362
MH: 02 0363MH: 02 0362downstream0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 03630 ft. MGO - General Observation - CONNECTION AT THE MH 9 O'CLOCK ACTIVE0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. VC - Vermin Cockroach7.2 ft. CM - Crack Multiple, from 03 to 09 o'clock, within 8 inches of joint: YES28.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"78.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"102.9 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"142.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"173.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"195.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"241.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"295.1 ft. TBA - Tap Break-In Active, at 09 o'clock, -, within 8 inches of joint: YES, 4"303.7 ft. AMH - Downstream Manhole, Survey Ends - 02 0362

Observation photos (1)

  • Crack Multiple, from 03 to 09 o'clock, within 8 inches of joint: YES

    7.2 ft. - Crack Multiple, from 03 to 09 o'clock, within 8 inches of joint: YES

Observations (15)

DistanceCodeObservation
303.7AMH02 0362
0MWM
0AMH02 0363
0MGOCONNECTION AT THE MH 9 O'CLOCK ACTIVE
295.1TBA
195.7TFA
0MWL
102.9TBA
0VC
28.4TF
7.2CM
241.1TFC
173.2TFC
142.1TFC
78.6TF

Properties (6)

additional_info
SC306011
custom_field_two
4
customer
LACSD
datetime
2016-08-12T02:15:00-07:00
documentation
PRO-PIPE
is_lateral_inspection
false