Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 8, 2016, 09:14 AM
  • 02 0383_02 0382 _20160808_034239.mp4

Date
08/08/2016
W/O
252431
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00250
PipeID
P02701
Time
2:14 AM
Certificate
U-507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3677
Sewer Name
02 DOWNEY AVENUE EXTENSION TRUNK
City
BELLFLOWER, CA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
36
Purpose
Routine Assessment
Project
WO_252431_TV02049_AUG2016
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
02 0383
Downstream MH
02 0382
Dir. of Survey
Downstream
Length Surveyed
377.7 ft.
Total Length
377.7 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2200
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
4
Pipe schematic from manhole 02 0383 to 02 0382
MH: 02 0383MH: 02 0382downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 03830 ft. MGO - General Observation - CONNECTION AT THE MH 3 O'CLOCK ACTIVE1.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start5.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"12.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"31.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"62.3 ft. MGO - General Observation - CONNECTION AT THE MH 9 O'CLOCK ACTIVE62.3 ft. MGO - General Observation - ADDED MANHOLE103.2 ft. TFB - Tap Factory Made Abandoned, at 02 o'clock, -, within 8 inches of joint: NO, 4"110.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"152.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"161.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"176.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"212.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"215.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"243.6 ft. TBC - Tap Break-In Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"271.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"278.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4", 4"311.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4" - W/ ROOTS318.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"337.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"373.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"376 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish377.7 ft. AMH - Downstream Manhole, Survey Ends - 02 0382

Observation photos (1)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    1.6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (26)

DistanceCodeObservation
377.7AMH02 0382
318.3TF
152.1TF
0MWM
271.5TFC
278.4TF
12.4TF
243.6TBC
161.6TFC
176.5TF
0MWL
5.1TF
0AMH02 0383
0MGOCONNECTION AT THE MH 3 O'CLOCK ACTIVE
1.6DAGS
215.4TF
62.3MGOCONNECTION AT THE MH 9 O'CLOCK ACTIVE
212.4TF
31.9TF
337.1TF
311.8TFCW/ ROOTS
62.3MGOADDED MANHOLE
376DAGS
110.4TF
373.6TF
103.2TFB

Properties (6)

additional_info
SC306007
custom_field_two
4
customer
LACSD
datetime
2016-08-08T02:14:00-07:00
documentation
PRO-PIPE
is_lateral_inspection
false