Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 18, 2016, 07:57 AM
  • 02 2283_02 2282_20161018_010723.mp4

Date
10/18/2016
W/O
597387
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00290
PipeID
P04534
Time
12:57 AM
Certificate
U-507-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3742
Sewer Name
02 MONTEREY PARK EXTENSION RELIEF TRUNK
City
MONTEREY PARK, CA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
06
Purpose
Routine Assessment
Project
WO_597387_TV02101_OCT2016
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
02 2283
Downstream MH
02 2282
Dir. of Survey
Downstream
Length Surveyed
281.5 ft.
Total Length
281.5 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2J11
O&M Rating
111
Overall Index
2
Overall Quick
Overall Rating
111
Pipe schematic from manhole 02 2283 to 02 2282
MH: 02 2283MH: 02 2282downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 22830 ft. MWL - Water Level, 15 %of cross sectional area3 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start279.5 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish281.5 ft. VC - Vermin Cockroach281.5 ft. AMH - Downstream Manhole, Survey Ends - 02 2282

Observation photos (1)

  • Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    3 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (7)

DistanceCodeObservation
0MWM
281.5VC
281.5AMH02 2282
279.5DAGS
3DAGS
0AMH02 2283
0MWL

Properties (7)

additional_info
SC303731
custom_field_two
4
customer
LACSD
datetime
2016-10-18T00:57:00-07:00
documentation
PRO-PIPE
is_lateral_inspection
false
year_laid
32490