Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 15, 2015, 10:18 AM
  • 02 1276_02 1275A_20151215021154.mp4

Date
12/15/2015
W/O
521098
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00238
PipeID
P03790
Time
2:18 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K2850
Sewer Name
02 BELVEDERE TRUNK
City
LOS ANGELES
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
12
Purpose
Routine Assessment
Project
WO_521098_TV02329_AUG2015
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Circular
Height
24 in.
Upstream MH
02 1276
Downstream MH
02 1275A
Dir. of Survey
Downstream
Length Surveyed
199.5 ft.
Total Length
199.5 ft.
Structural Index
3
Structural Quick
3B22
Structural Rating
55
O&M Index
2
O&M Quick
2G00
O&M Rating
78
Overall Index
2
Overall Quick
Overall Rating
133
Pipe schematic from manhole 02 1276 to 02 1275A
MH: 02 1276MH: 02 1275Adownstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 12760 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start87.1 ft. CS - Crack Spiral, from 09 to 11 o'clock, within 8 inches of joint: YES97.1 ft. CS - Crack Spiral, from 09 to 10 o'clock, within 8 inches of joint: YES120.2 ft. CM - Crack Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES, Start154.9 ft. FS - Fracture Spiral, from 07 to 11 o'clock, within 8 inches of joint: YES198.4 ft. CM - Crack Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES, Finish198.4 ft. MGO - General Observation - ROACHES IN MH198.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish199.5 ft. AMH - Downstream Manhole, Survey Ends - 02 1275A199.5 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK

Observation photos (3)

  • Crack Spiral, from 09 to 11 o'clock, within 8 inches of joint: YES

    87.1 ft. - Crack Spiral, from 09 to 11 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 09 to 10 o'clock, within 8 inches of joint: YES

    97.1 ft. - Crack Spiral, from 09 to 10 o'clock, within 8 inches of joint: YES

  • Fracture Spiral, from 07 to 11 o'clock, within 8 inches of joint: YES

    154.9 ft. - Fracture Spiral, from 07 to 11 o'clock, within 8 inches of joint: YES

Observations (13)

DistanceCodeObservation
198.4CM
199.5AMH02 1275A
198.4MGOROACHES IN MH
154.9FS
120.2CM
0MWL
97.1CS
198.4DAGS
199.5MGOACTIVE CONNECTION AT MH 9 O'CLOCK
2DAGS
0AMH02 1276
0MWM
87.1CS

Properties (6)

additional_info
SC204184
custom_field_two
3
customer
LACSD
datetime
2015-12-15T02:18:27-08:00
documentation
PRO PIPE
is_lateral_inspection
false