Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 22, 2016, 10:07 AM
  • 01 0250_01 0249_062216_030833.mpg

Date
06/22/2016
W/O
574241
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00218
PipeID
P01295
Time
3:07 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3403
Sewer Name
01 SOUTH PARK AVENUE TRUNK
City
LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
12
Purpose
Routine Assessment
Project
WO_574241_TV01204_JUNE2016
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Lining Method
Segmented Panel
Shape
Circular
Height
18 in.
Upstream MH
01 0250
Downstream MH
01 0249
Dir. of Survey
Downstream
Length Surveyed
344.9 ft.
Total Length
344.9 ft.
Structural Index
3
Structural Quick
3M00
Structural Rating
204
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
204
Pipe schematic from manhole 01 0250 to 01 0249
MH: 01 0250MH: 01 0249downstream0 ft. MGO - General Observation - CONNECTION AT THE MH 9 O'CLOCK0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 01 02500 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT THE MH 3 O'CLOCK3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start66.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"93.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"119.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"142.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"169.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"193.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"219.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"243.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"266.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"292.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"319 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"342.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"344.9 ft. AMH - Downstream Manhole, Survey Ends - 01 0249344.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish344.9 ft. MGO - General Observation - CONNECTION AT THE MH CAPPED 3 O'CLOCK

Observation photos (1)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (21)

DistanceCodeObservation
344.9AMH01 0249
344.9CM
266.6TFC
319TFC
342.5TFC
119.5TFC
344.9MGOCONNECTION AT THE MH CAPPED 3 O'CLOCK
292.6TFC
193.1TFC
0MGOCONNECTION AT THE MH 9 O'CLOCK
219.9TFC
0MWL
0AMH01 0250
243.4TF
142.9TFC
0MWM
0MGOCONNECTION AT THE MH 3 O'CLOCK
169.8TFC
3CM
66.5TFC
93.1TF

Properties (5)

additional_info
SC305853
custom_field_two
3
customer
LACSD
datetime
2016-06-22T03:07:48-07:00
is_lateral_inspection
false