Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 2, 2019, 04:11 PM
  • H 0707_H 0706_722019_091905.mp4

  • H 0707_H 0706_722019_093249.mp4

Date
07/02/2019
W/O
0772128
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00941
PipeID
P11114
Time
9:11 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G8016
Sewer Name
H JOINT OUTFALL H - UNIT 9B
City
INDUSTRY
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
33
Purpose
Routine Assessment
Project
20190702DF_JOINT_OUTFALL_H_UNIT_9B
Material
NRCP
Shape
Circular
Height
25 in.
Upstream MH
H 0707
Downstream MH
H 0706
Dir. of Survey
Downstream
Length Surveyed
635.9 ft.
Total Length
635.9 ft.
Structural Index
3
Structural Quick
5131
Structural Rating
10
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole H 0707 to H 0706
MH: H 0707MH: H 0706downstream0 ft. AMH - Upstream Manhole, Survey Begins - 9:17 AM0 ft. MWL - Water Level, 15 %of cross sectional area0.1 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.9 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 65% MAG3.9 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start102.1 ft. MGP - General Photograph146.4 ft. MGP - General Photograph290.8 ft. MGP - General Photograph453.1 ft. MGP - General Photograph523.6 ft. MGP - General Photograph632.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish633 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish633.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish633.4 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 65% MAG635.9 ft. AMH - Downstream Manhole, Survey Ends - 10:01 AM635.9 ft. MGO - General Observation - Mag Coat xx% 9 to 3 o' Clock Throughout

Observation photos (9)

  • Upstream Manhole, Survey Begins - 9:17 AM

    0 ft. - Upstream Manhole, Survey Begins - 9:17 AM

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 65% MAG

    3.9 ft. - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 65% MAG

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.9 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Photograph

    102.1 ft. - General Photograph

  • General Photograph

    146.4 ft. - General Photograph

  • General Photograph

    290.8 ft. - General Photograph

  • General Photograph

    453.1 ft. - General Photograph

  • General Photograph

    523.6 ft. - General Photograph

Observations (18)

DistanceCodeObservation
102.1MGP
633SRV
290.8MGP
146.4MGP
0AMH9:17 AM
633.4SZ65% MAG
0MWL
635.9AMH10:01 AM
3.9SSS
3.9SZ65% MAG
453.1MGP
523.6MGP
633.1SSS
3.9SRV
635.9MGOMag Coat xx% 9 to 3 o' Clock Throughout
0.1MWM
632.9SAV
2SAV

Properties (5)

custom_field_two
4
customer
LACSD
datetime
2019-07-02T09:11:59-07:00
documentation
FRANKLIN, CASTILLO, IGNACIO
is_lateral_inspection
false