Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 11, 2017, 11:00 AM
  • 18 0929_18 0928 __081117_040139.mp4

Date
08/11/2017
W/O
646328
Weather
Dry
Operator/Surveyor
JUAN B
Sewer ID
Z00700
PipeID
P14777
Time
4:00 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K4684
Sewer Name
18 SCOTT AVENUE TRUNK
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
21
Purpose
Routine Assessment
Project
WO_646328_TV18118_JUL2017
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
18 0929
Downstream MH
18 0928
Dir. of Survey
Downstream
Length Surveyed
348.6 ft.
Total Length
348.6 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 18 0929 to 18 0928
MH: 18 0929MH: 18 0928downstream0 ft. AMH - Upstream Manhole, Survey Begins - 18 09290 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start6.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start23.1 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"25.5 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 4"29.8 ft. TB - Tap Break-In, at 03 o'clock, -, within 8 inches of joint: NO, 4"70.6 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 6"73.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"121.7 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 4"124 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 4"172.6 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 6"174.6 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 6"222.6 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 6"225.3 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 4"273 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"275.9 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 6"320.9 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 4"323.2 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 4"341.9 ft. TB - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: NO, 4"348.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish348.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish348.6 ft. MGO - General Observation - CONNECTION AT 9 OC348.6 ft. AMH - Downstream Manhole, Survey Ends - 18 0928

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6.5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (25)

DistanceCodeObservation
341.9TB
275.9TF
6.5CM
0AMH18 0929
273TFC
73.4TF
225.3TF
348.6CM
320.9TF
0MWL
124TF
0MWM
174.6TF
29.8TB
348.6DAGS
323.2TF
121.7TF
70.6TF
25.5TFC
172.6TF
3DAGS
222.6TF
348.6MGOCONNECTION AT 9 OC
348.6AMH18 0928
23.1TFC

Properties (6)

additional_info
SC345623
custom_field_two
3
customer
LACSD
datetime
2017-08-11T04:00:26-07:00
documentation
PROPIPE
is_lateral_inspection
false