Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 21, 2017, 10:48 AM
  • 01 0425_01 0424_21032017_034938.mpg

Date
03/21/2017
W/O
625686
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00208
PipeID
P00906
Time
3:48 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4390
Sewer Name
01 HOLMES-WILLOWBROOK TRUNK
City
LOS ANGELES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
13
Purpose
Routine Assessment
Project
WO_625686_TV01030_MAR2017
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
01 0425
Downstream MH
01 0424
Dir. of Survey
Downstream
Length Surveyed
241.2 ft.
Total Length
241.2 ft.
Structural Index
3
Structural Quick
3H00
Structural Rating
141
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
141
Pipe schematic from manhole 01 0425 to 01 0424
MH: 01 0425MH: 01 0424downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 01 04252.8 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start21.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"29.2 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"41.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"64.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"69.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"90.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"92.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"98.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"111 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"149.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"164.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"169.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"198 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"238.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish241.2 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK241.2 ft. AMH - Downstream Manhole, Survey Ends - 01 0424

Observation photos (2)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.8 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"

    29.2 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"

Observations (21)

DistanceCodeObservation
149.1TFC
0MWL
198TFC
0MWM
0MGOCONNECTION AT MH 9 O'CLOCK
69.7TFC
41.8TFC
164.6TFC
241.2MGOCONNECTION AT MH 9 O'CLOCK
169.5TFC
0AMH01 0425
111TFA
92.6TFC
29.2TB
21.6TF
64.7TFC
2.8SAV
90.5TF
98.1TFC
241.2AMH01 0424
238.7SAV

Properties (6)

additional_info
SC306899
custom_field_two
3
customer
LACSD
datetime
2017-03-21T03:48:35-07:00
documentation
PROPIPE
is_lateral_inspection
false