Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 22, 2017, 06:21 AM
  • 01 0418A_01 0418_21032017_232200.mpg

Date
03/21/2017
W/O
625686
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00208
PipeID
P00899
Time
11:21 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4394
Sewer Name
01 HOLMES-WILLOWBROOK TRUNK
City
LOS ANGELES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
13
Purpose
Routine Assessment
Project
WO_625686_TV01030_MAR2017
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
01 0418A
Downstream MH
01 0418
Dir. of Survey
Downstream
Length Surveyed
136.9 ft.
Total Length
137 ft.
Structural Index
3
Structural Quick
3D00
Structural Rating
78
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
78
Pipe schematic from manhole 01 0418A to 01 0418
MH: 01 0418AMH: 01 0418downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 01 0418A0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start7.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"18.5 ft. MGO - General Observation - REPAIR PATCH20.9 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"38.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"49.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"54.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"85.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"87.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"95.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"97.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"122.3 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"123.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"134.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish137 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK137 ft. AMH - Downstream Manhole, Survey Ends - 01 0418

Observation photos (1)

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"

    122.3 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6"

Observations (20)

DistanceCodeObservation
2SAV
137MGOCONNECTION AT MH 3 O'CLOCK
137AMH01 0418
7.7TFC
18.5MGOREPAIR PATCH
54.4TF
0MGOCONNECTION AT MH 9 O'CLOCK
95.7TFA
87.8TFC
122.3TB
85.3TFC
38.9TF
0AMH01 0418A
97.8TFC
123.6TFC
134.1SAV
49.2TFC
0MWM
0MWL
20.9TBA

Properties (6)

additional_info
SC345153
custom_field_two
3
customer
LACSD
datetime
2017-03-21T23:21:41-07:00
documentation
PROPIPE
is_lateral_inspection
false