Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 21, 2017, 08:51 AM
  • 01 0430A_01 0430_21032017_015218.mpg

Date
03/21/2017
W/O
624631
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00208
PipeID
P00912
Time
1:51 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4389
Sewer Name
01 HOLMES-WILLOWBROOK TRUNK
City
LOS ANGELES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
10
Purpose
Routine Assessment
Project
WO_624631_TV01248_MAR2017
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
01 0430A
Downstream MH
01 0430
Dir. of Survey
Downstream
Length Surveyed
155.2 ft.
Total Length
155.2 ft.
Structural Index
3
Structural Quick
3E2B
Structural Rating
122
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
122
Pipe schematic from manhole 01 0430A to 01 0430
MH: 01 0430AMH: 01 0430downstream0 ft. AMH - Upstream Manhole, Survey Begins - 01 0430A0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area3.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start17.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"29.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"44.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"56.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"68.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"71.4 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start86.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"94.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"99.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"120.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"128 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"141.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"150.1 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish154.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish155.2 ft. AMH - Downstream Manhole, Survey Ends - 01 0430

Observation photos (2)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.7 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

    71.4 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
150.1CL
0AMH01 0430A
141.1TF
0MGOCONNECTION AT MH 3 O'CLOCK
56.4TFC
94.8TF
29.9TFC
44.7TF
3.7SAV
99.3TF
0MWL
0MWM
17.3TF
71.4CL
120.6TF
128TF
154.4SAV
155.2AMH01 0430
68.2TFC
86.3TFC

Properties (6)

additional_info
SC306898
custom_field_two
3
customer
LACSD
datetime
2017-03-21T01:51:43-07:00
documentation
PROPIPE
is_lateral_inspection
false