Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 28, 2017, 08:56 AM
  • 15 0114_15 0113 _28062017_021856.mp4

Date
06/28/2017
W/O
624421
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00634
PipeID
P12011
Time
1:56 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4595
Sewer Name
15 TYLER AVENUE TRUNK
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
28
Purpose
Routine Assessment
Project
WO_624421_TV15037_JUN2017
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
15 0114
Downstream MH
15 0113
Dir. of Survey
Downstream
Length Surveyed
403.9 ft.
Total Length
403.9 ft.
Structural Index
3
Structural Quick
3O00
Structural Rating
240
O&M Index
2
O&M Quick
2\00
O&M Rating
288
Overall Index
2
Overall Quick
Overall Rating
528
Pipe schematic from manhole 15 0114 to 15 0113
MH: 15 0114MH: 15 0113downstream0 ft. AMH - Upstream Manhole, Survey Begins - 15 01140 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start77.1 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS96.4 ft. MGO - General Observation - MAG COATING 65%120.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"172.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"221 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"235.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"299.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"327.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6", 6"395 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish401.5 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish401.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish403.9 ft. MGO - General Observation - COCKROACHES IN MANHOLE403.9 ft. MGO - General Observation - ACTIVE CONNECTIONS AT MH 3 AND 9 O'CLOCK403.9 ft. AMH - Downstream Manhole, Survey Ends - 15 0113

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (21)

DistanceCodeObservation
120.6TFA
395DSZ
2DAGS
2SAV
0AMH15 0114
0MGOCOCKROACHES IN MANHOLE
0MWM
401.5SAV
235.9TFC
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
221TFA
403.9MGOCOCKROACHES IN MANHOLE
299.6TF
77.1DSZDEBRIS
403.9MGOACTIVE CONNECTIONS AT MH 3 AND 9 O'CLOCK
96.4MGOMAG COATING 65%
403.9AMH15 0113
0MWL
327.2TFC
172.7TFA
401.5DAGS

Properties (6)

additional_info
SC345421
custom_field_two
3
customer
LACSD
datetime
2017-06-28T01:56:21-07:00
documentation
PRO PIPE
is_lateral_inspection
false