Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 1, 2017, 08:58 AM
  • Section#2_18 1027_18 1026__812017__G6787.mp4

Date
08/01/2017
W/O
0653438
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00677
PipeID
P14881
Time
1:58 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Heavy Cleaning
Media Label
G6787
Sewer Name
18 LA HABRA HEIGHTS TRUNK, SECTION 1
City
LA HABRA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
22
Purpose
Routine Assessment
Project
20170801MDM_LA_HABRA_HEIGHTS_TRUNK_SECTION_1
Material
Vitrified Clay Pipe
Shape
Circular
Height
7.559999942779541 in.
Upstream MH
18 1027
Downstream MH
18 1026
Dir. of Survey
Downstream
Length Surveyed
160.6 ft.
Total Length
160.6 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
5144
O&M Rating
63
Overall Index
2
Overall Quick
Overall Rating
63
Pipe schematic from manhole 18 1027 to 18 1026
MH: 18 1027MH: 18 1026downstream0 ft. AMH - Upstream Manhole, Survey Begins - 2:00AM0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area7.9 ft. MGO - General Observation - 8" VCP-CIPP36.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start140.8 ft. MGP - General Photograph142.1 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 07 to 06 o'clock, , within 8 inches of joint: YES, Start142.1 ft. MGO - General Observation - ZOOM 18' TO MH 1026142.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish142.5 ft. MWL - Water Level, 50 %of cross sectional area142.5 ft. MWM - Water Mark, 100 %of cross sectional area160.1 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 07 to 06 o'clock, , within 8 inches of joint: YES, Finish160.6 ft. AMH - Downstream Manhole, Survey Ends - 2:30AM

Observation photos (5)

  • General Observation - 8" VCP-CIPP

    7.9 ft. - General Observation - 8" VCP-CIPP

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    36.8 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Photograph

    140.8 ft. - General Photograph

  • Deposits Attached Grease, 20 %of cross sectional area, from 07 to 06 o'clock,  , within 8 inches of joint: YES, Start

    142.1 ft. - Deposits Attached Grease, 20 %of cross sectional area, from 07 to 06 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - ZOOM 18' TO MH 1026

    142.1 ft. - General Observation - ZOOM 18' TO MH 1026

Observations (13)

DistanceCodeObservation
142.1DAGS
142.1MGOZOOM 18' TO MH 1026
142.1DAGS
0AMH2:00AM
142.5MWL
160.1DAGS
0MWM
142.5MWM
7.9MGO8" VCP-CIPP
36.8DAGS
140.8MGP
0MWL
160.6AMH2:30AM

Properties (7)

custom_field_three
LINER GOOD COND.
custom_field_two
4
customer
LACSD
datetime
2017-08-01T01:58:32-07:00
documentation
MARTIN,MANANES,REVELES
is_lateral_inspection
false
lining
CIPP