Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 7, 2017, 09:57 AM
  • 18 1216_18 1215 _07012017_015814.mpg

Date
01/07/2017
W/O
616852
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z01132
PipeID
P25329
Time
1:57 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4114
Sewer Name
18 PUENTE HILLS LANDFILL FACILITIES SEWER
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
01
Purpose
Routine Assessment
Project
WO_616852_DISTRICT18_JAN2017
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
18 1216
Downstream MH
18 1215
Dir. of Survey
Downstream
Length Surveyed
446.3 ft.
Total Length
446.3 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2Q00
O&M Rating
178
Overall Index
2
Overall Quick
Overall Rating
178
Pipe schematic from manhole 18 1216 to 18 1215
MH: 18 1216MH: 18 1215downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 18 12160 ft. MWM - Water Mark, 25 %of cross sectional area2.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start446.3 ft. AMH - Downstream Manhole, Survey Ends - 18 1215446.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish

Observation photos (1)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (7)

DistanceCodeObservation
0MWL
446.3AMH18 1215
2.2DAGS
0MGOCONNECTION AT MH 9 O'CLOCK
0AMH18 1216
446.3DAGS
0MWM

Properties (5)

additional_info
SC306474
custom_field_two
4
customer
LACSD
datetime
2017-01-07T01:57:29-08:00
is_lateral_inspection
false