Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 30, 2017, 07:38 AM
  • B 0697_B 0696 _29112017_235500.mpg

Date
11/29/2017
W/O
674032
Weather
Dry
Operator/Surveyor
ERUIZ
Sewer ID
Z00110
PipeID
P09367
Time
11:38 PM
Certificate
123456
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5148
Sewer Name
B JOINT OUTFALL B - UNIT 8G
City
DUARTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
08
Purpose
Routine Assessment
Project
WO_674032_TV22155_DEC2017
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
B 0697
Downstream MH
B 0696
Dir. of Survey
Downstream
Length Surveyed
391.6 ft.
Total Length
391.6 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole B 0697 to B 0696
MH: B 0697MH: B 0696downstream0 ft. MGO - General Observation - SERVICE CONNECTION AT 3 O' CLOCK AT MH0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 06977.1 ft. MGO - General Observation - MAGNEZIUM H.O COATING start23.8 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start44.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"50 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"73.9 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"79.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"168.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"170.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"201.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"203.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"258.8 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 8"267.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8"307.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"309.7 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8" - ROOTS389.7 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish391.6 ft. MGO - General Observation - SERVICE CONNECTION AT 3 O' CLOCK AT MH391.6 ft. MGO - General Observation - SERVICE CONNECTION AT 9 O'CLOCK AT MH391.6 ft. AMH - Downstream Manhole, Survey Ends - B 0696

Observation photos (2)

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    23.8 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8" - ROOTS

    309.7 ft. - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 8" - ROOTS

Observations (22)

DistanceCodeObservation
0MGOSERVICE CONNECTION AT 3 O' CLOCK AT MH
168.2TFC
50TFA
23.8SAV
203.8TFC
44.4TFC
79.9TFC
0MWL
201.1TFA
170.7TFA
0MWM
7.1MGOMAGNEZIUM H.O COATING start
391.6MGOSERVICE CONNECTION AT 3 O' CLOCK AT MH
391.6MGOSERVICE CONNECTION AT 9 O'CLOCK AT MH
258.8TFA
267.6TFA
307.1TFC
309.7TFAROOTS
0AMHB 0697
389.7SAV
391.6AMHB 0696
73.9TFA

Properties (6)

additional_info
SC346458
custom_field_two
3
customer
LACSD
datetime
2017-11-29T23:38:30-08:00
documentation
PROPIPE
is_lateral_inspection
false