Wastewater/Activity/PacpInspection/1.0Nov 14, 2017, 05:48 PM
  • H 0391_H 0390 _141117_100704.mpg

Date
11/14/2017
W/O
630138
Weather
Dry
Operator/Surveyor
ERUIZ
Sewer ID
Z00177
PipeID
P10820
Time
9:48 AM
Certificate
123456
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5135
Sewer Name
H JOINT OUTFALL H - UNIT 5A
City
PICO RIVERA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
03
Purpose
Routine Assessment
Project
WO_630138_TV18073_NOV2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
54 in.
Width
54 in.
Upstream MH
H 0391
Downstream MH
H 0390
Dir. of Survey
Downstream
Length Surveyed
771.3 ft.
Total Length
771.3 ft.
Structural Index
3
Structural Quick
3200
Structural Rating
6
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
6
Pipe schematic from manhole H 0391 to H 0390
MH: H 0391MH: H 0390downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 03910 ft. MWM - Water Mark, 45 %of cross sectional area0 ft. MWL - Water Level, 40 %of cross sectional area7.7 ft. MGO - General Observation - MAGNEZIUM H.O COATING start7.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start767.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish767.6 ft. MGO - General Observation - MAGNEZIUM H.O COATING finish770 ft. MGO - General Observation - REBAR PROJECTING THROUGHOUT THE REACH, FROM 08 TO 04 O'CLOCK770 ft. MGO - General Observation - SPALLING THROUGHOUT THE REACH, FROM 08 TO 04 O'CLOCK771.3 ft. AMH - Downstream Manhole, Survey Ends - H 0390

Observation photos (1)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    7.7 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
0AMHH 0391
767.6SAP
0MWM
7.7MGOMAGNEZIUM H.O COATING start
771.3AMHH 0390
767.6MGOMAGNEZIUM H.O COATING finish
0MWL
770MGOREBAR PROJECTING THROUGHOUT THE REACH, FROM 08 TO 04 O'CLOCK
770MGOSPALLING THROUGHOUT THE REACH, FROM 08 TO 04 O'CLOCK
7.7SAP

Properties (6)

additional_info
SC348344
custom_field_two
2
customer
LACSD
datetime
2017-11-14T09:48:25-08:00
documentation
PROPIPE
is_lateral_inspection
false