Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 30, 2016, 07:54 AM
  • F 0165_F 0164_20160330_014527.mp4

Date
03/30/2016
W/O
563421
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00044
PipeID
P10300
Time
12:54 AM
Certificate
U-507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3239
Sewer Name
F JOINT OUTFALL F - UNIT 7B
City
NORWALK, CA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
37A
Purpose
Routine Assessment
Project
WO_563421_TV18071_APRIL2016
Sewer Type
GRAVITY
Material
Reinforced Concrete Pipe
Shape
Circular
Height
48 in.
Upstream MH
F 0165
Downstream MH
F 0164
Dir. of Survey
Downstream
Length Surveyed
417.6 ft.
Total Length
417.6 ft.
Structural Index
1
Structural Quick
1100
Structural Rating
1
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
1
Overall Quick
Overall Rating
1
Pipe schematic from manhole F 0165 to F 0164
MH: F 0165MH: F 0164downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - F 01652 ft. MGO - General Observation - MAGNEZIUM H.O. START 50%5.3 ft. SRI - Surface Roughness Increased, from 09 to 03 o'clock, within 8 inches of joint: YES, Start414.1 ft. SRI - Surface Roughness Increased, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish417.6 ft. AMH - Downstream Manhole, Survey Ends - F 0164

Observation photos (2)

  • General Observation - MAGNEZIUM H.O. START 50%

    2 ft. - General Observation - MAGNEZIUM H.O. START 50%

  • Surface Roughness Increased, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    5.3 ft. - Surface Roughness Increased, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (7)

DistanceCodeObservation
0MWM
417.6AMHF 0164
2MGOMAGNEZIUM H.O. START 50%
5.3SRI
0MWL
0AMHF 0165
414.1SRI

Properties (6)

additional_info
SC305330
custom_field_two
4
customer
LACSD
datetime
2016-03-30T00:54:57-07:00
documentation
PRO-PIPE
is_lateral_inspection
false