Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 17, 2015, 07:29 AM
  • H 0374_H 0373_20151116_235102.mp4

Date
11/16/2015
W/O
531052
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00172
PipeID
P10712
Time
11:29 PM
Certificate
U-507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K2864
Sewer Name
H JOINT OUTFALL H - UNIT 2G
City
LOS ANGELES, CA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
16
Purpose
Routine Assessment
Project
WO_531052_TV02281_OCT2015
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Upstream MH
H 0374
Downstream MH
H 0373
Dir. of Survey
Downstream
Length Surveyed
443 ft.
Total Length
443 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
412b
O&M Rating
351
Overall Index
2
Overall Quick
Overall Rating
351
Pipe schematic from manhole H 0374 to H 0373
MH: H 0374MH: H 0373downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 0374 (2332)0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MANHOLE 9 O'CLOCK2 ft. DNGV - Deposits Ingress Gravel, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: NO, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start439.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish439.2 ft. DNGV - Deposits Ingress Gravel, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish443 ft. AMH - Downstream Manhole, Survey Ends - H 0373 (2350)443 ft. VC - Vermin Cockroach

Observations (10)

DistanceCodeObservation
439.2DAGS
0MWL
2DNGV
443AMHH 0373 (2350)
0AMHH 0374 (2332)
0MWM
0MGOCONNECTION AT MANHOLE 9 O'CLOCK
439.2DNGV
2DAGS
443VC

Properties (6)

additional_info
SC205629
custom_field_two
4
customer
LACSD
datetime
2015-11-16T23:29:15-08:00
documentation
PRO-PIPE
is_lateral_inspection
false