Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 25, 2016, 08:42 AM
  • 21 1028_21 1027_20160425_025845.mp4

Date
04/25/2016
W/O
557418
Weather
Light Rain
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00784
PipeID
P16129
Time
1:42 AM
Certificate
U-109-7948
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K 3190
Sewer Name
21 SAN ANTONIO TRUNK
City
CLAREMONT
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
06
Purpose
Routine Assessment
Project
WO_557418_TV21023_APRIL2016
Sewer Type
SIPHON
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Upstream MH
21 1028
Downstream MH
21 1027
Dir. of Survey
Downstream
Length Surveyed
295.5 ft.
Total Length
295.5 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole 21 1028 to 21 1027
MH: 21 1028MH: 21 1027downstream0 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 21 102840.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"43.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"74.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"76.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"123.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"126.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"173.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"176 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"223.4 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 4"226 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"245.9 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"273.7 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 4"276.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"295.5 ft. AMH - Downstream Manhole, Survey Ends - 21 1027

Observations (18)

DistanceCodeObservation
173.9TFC
0MGOCONNECTION AT THE MH 9 OC'LOCK
0MWL
0MWM
123.9TFC
276.2TFC
245.9TBA
273.7TFC
176TFC
40.9TFC
223.4TFC
226TFC
0AMH21 1028
74.3TFC
295.5AMH21 1027
126.4TFC
76.8TFC
43.4TFC

Properties (6)

additional_info
SC226238
custom_field_two
4
customer
LACSD
datetime
2016-04-25T01:42:15-07:00
documentation
PRO PIPE
is_lateral_inspection
false