- Date
- 04/20/2016
- W/O
- 557418
- Weather
- Dry
- Operator/Surveyor
- N.ZAHREDDINE
- Sewer ID
- Z00784
- PipeID
- P16140
- Time
- 4:24 AM
- Certificate
- U-109-7948
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- Not Known
- Media Label
- K 3186
- Sewer Name
- 21 SAN ANTONIO TRUNK
- City
- POMONA
- Loc. details
- Light Highway
- Location Code
- C
- Use of Sewer
- Sanitary Sewer
- District
- District 21
- Page No.
- 03
- Purpose
- Routine Assessment
- Project
- WO_557418_TV21023_APRIL2016
- Sewer Type
- GRAVITY
- Material
- Vitrified Clay Pipe
- Shape
- Circular
- Height
- 12 in.
- Upstream MH
- 21 1036
- Downstream MH
- 21 1035
- Dir. of Survey
- Downstream
- Length Surveyed
- 373.1 ft.
- Total Length
- 373.1 ft.
- Structural Index
- 5
- Structural Quick
- 5100
- Structural Rating
- 5
- O&M Index
- 2
- O&M Quick
- 2111
- O&M Rating
- 3
- Overall Index
- 3
- Overall Quick
- —
- Overall Rating
- 8
Pipe schematic from manhole 21 1036 to 21 1035 Observation photos (3)

0 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

37.6 ft. - Broken, from 10 to 03 o'clock, within 8 inches of joint: YES

130.5 ft. - Roots Fine Joint, from 02 to 04 o'clock, within 8 inches of joint: YES