Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 20, 2017, 07:29 AM
  • 02 0025A_02 0025_7202017_033814.mp4

Date
07/20/2017
W/O
0641143
Weather
Dry
Operator/Surveyor
REVELES
Sewer ID
Z00234
PipeID
P03056
Time
12:29 AM
Certificate
U-11506022630
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0596
Sewer Name
02 ARTESIA EXTENSION TRUNK
City
BELLFLOWER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
39
Purpose
Capital Improvement Program Assesment
Project
20170720VMR_ARTESIA_EXTENSION_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Upstream MH
02 0025
Downstream MH
02 0025A
Dir. of Survey
Upstream
Length Surveyed
207.4 ft.
Total Length
207.4 ft.
Structural Index
1
Structural Quick
3116
Structural Rating
9
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
1
Overall Quick
Overall Rating
9
Pipe schematic from manhole 02 0025 to 02 0025A
MH: 02 0025MH: 02 0025Aupstream0 ft. MGP - General Photograph - DEBRIS0 ft. AMH - Upstream Manhole, Survey Ends - 04:25 AM32.7 ft. CC - Crack Circumferential, from 12 to 03 o'clock, within 8 inches of joint: NO46.1 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 4"75.3 ft. CM - Crack Multiple, from 09 to 01 o'clock, within 8 inches of joint: YES81.2 ft. CC - Crack Circumferential, from 10 to 02 o'clock, within 8 inches of joint: YES94 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 4"101.5 ft. CC - Crack Circumferential, from 10 to 12 o'clock, within 8 inches of joint: YES108.9 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 4"149 ft. CC - Crack Circumferential, from 09 to 02 o'clock, within 8 inches of joint: YES165.6 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"167.1 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"191 ft. CC - Crack Circumferential, from 09 to 11 o'clock, within 8 inches of joint: YES192 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 4" - Open193.4 ft. CC - Crack Circumferential, from 09 to 03 o'clock, within 8 inches of joint: YES194.7 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 4"207.4 ft. AMH - Downstream Manhole, Survey Begins - 03:56 AM207.4 ft. MWM - Water Mark, 20 %of cross sectional area207.4 ft. MWL - Water Level, 10 %of cross sectional area

Observations (19)

DistanceCodeObservation
0AMH03:56 AM
174.7CC
16.4CC
0MWM
41.8TBA
105.9CC
161.3TF
15.4TFOpen
207.4MGPDEBRIS
12.7TFC
113.4TF
14CC
207.4AMH04:25 AM
40.3TBA
0MWL
98.5TFC
132.1CM
126.2CC
58.4CC

Properties (5)

custom_field_two
4
customer
LACSD
datetime
2017-07-20T00:29:46-07:00
documentation
REVELES,MANANES,OLIVER
is_lateral_inspection
false