Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 7, 2017, 08:15 AM
  • 16 0275_16 0274_772017_012416.mp4

Date
07/07/2017
W/O
#
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00652
PipeID
P13317
Time
1:15 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0583R
Sewer Name
16 CHAPEL AVENUE TRUNK, SECTION 1
City
SOUTH PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
17
Purpose
Maintenance Related
Project
20170717MDM_CHAPEL_AVENUE_TRUNK_SECTION_1
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Upstream MH
16 0275
Downstream MH
16 0274
Dir. of Survey
Downstream
Length Surveyed
218.5 ft.
Total Length
218.5 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2211
O&M Rating
5
Overall Index
2
Overall Quick
Overall Rating
5
Pipe schematic from manhole 16 0275 to 16 0274
MH: 16 0275MH: 16 0274downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 1:20AM0 ft. MWL - Water Level, 20 %of cross sectional area33.6 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES - ROCKS74.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped85.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped98 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Active113 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped124.7 ft. MGO - General Observation - 18" VCP124.7 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open-30% ROOTS136 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped148 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped162.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open162.9 ft. RFL - Roots Fine Lateral, at 10 o'clock - 5%174.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped189 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open201 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open218 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active218.5 ft. AMH - Downstream Manhole, Survey Ends - 1:35AM

Observations (19)

DistanceCodeObservation
174.7TFCCapped
0MWM
201TFOpen
162.9TFOpen
148TFCCapped
85.9TFCCapped
162.9RFL5%
0AMH1:20AM
98TFActive
124.7MGO18" VCP
74.4TFCCapped
136TFCCapped
218MGOConn. @ Mh, 9 O' Clock. Active
113TFCCapped
189TFCOpen
33.6DSZROCKS
218.5AMH1:35AM
124.7TFDOpen-30% ROOTS
0MWL

Properties (4)

customer
LACSD
datetime
2017-07-07T01:15:49-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false