28 0084_28 0083_6292019_145353.mp4
0 ft. - Water Level, 10 %of cross sectional area
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
132.4 ft. - General Photograph
132.4 ft. - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: YES, 4"
132.4 ft. - General Photograph
136.1 ft. - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: YES, 4"
136.1 ft. - Fracture Spiral, from 02 to 10 o'clock, within 8 inches of joint: YES
140.4 ft. - General Photograph
140.4 ft. - General Photograph
146.7 ft. - General Photograph
152.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: YES
152.5 ft. - General Photograph
158.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 11 to 01 o'clock, , within 8 inches of joint: YES
170.5 ft. - Joint Offset Medium, .25"
176.7 ft. - Joint Offset Medium, .25"
206 ft. - General Photograph
| Distance | Code | Observation |
|---|---|---|
| 0 | AMH | 2:26 PM |
| 140.4 | MGP | — |
| 170.5 | JOM | — |
| 2 | SSS | — |
| 176.7 | JOM | — |
| 152.2 | DAGS | — |
| 136.1 | TB | — |
| 0 | MGO | Conn. @ Mh, 9 O' Clock. Active |
| 132.4 | MGP | — |
| 140.4 | MGP | — |
| 152.5 | MGP | — |
| 209.5 | MGO | GREASE THROUGHOUT THE REACH (5%) |
| 132.4 | TB | — |
| 136.1 | FS | — |
| 206 | MGP | — |
| 146.7 | MGP | — |
| 209.5 | AMH | 3:29 PM |
| 0 | MGO | ROACHES @ MH |
| 158.4 | DAGS | — |
| 0 | MWL | — |
| 132.4 | MGP | — |
| 0 | MWM | — |
| 204 | SSS | — |