Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 28, 2019, 07:25 PM
  • 18 0433_18 0432_6282019_123324.mp4

Date
06/28/2019
W/O
0767446
Weather
Dry
Operator/Surveyor
BRAR
Sewer ID
Z00675
PipeID
P14281
Time
12:25 PM
Certificate
0618-0703002249
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G8013
Sewer Name
18 FLORENCE AVENUE TRUNK
City
SANTA FE SPRINGS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
19
Purpose
Routine Assessment
Project
20190628SB_FLORENCE_AVE_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
18 0433
Downstream MH
18 0432
Dir. of Survey
Downstream
Length Surveyed
351.3 ft.
Total Length
351.3 ft.
Structural Index
4
Structural Quick
5131
Structural Rating
8
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
8
Pipe schematic from manhole 18 0433 to 18 0432
MH: 18 0433MH: 18 0432downstream0 ft. AMH - Upstream Manhole, Survey Begins - 12:29PM0.1 ft. MGO - General Observation - BULKHEAD @ 6 O"CLOCK0.1 ft. MWM - Water Mark, 10 %of cross sectional area0.1 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active0.1 ft. MWL - Water Level, 5 %of cross sectional area2 ft. MGO - General Observation - POSSIBLE MAG COAT 8 TO 4 O'CLOCK2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start26.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"31.5 ft. MGO - General Observation - GREASE 4 TO 8 O'CLOCK49.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"73.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"90.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"175.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"198.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"223.2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start231.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"263.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"279.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"303.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"327.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"348.2 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish348.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish351.3 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH351.3 ft. AMH - Downstream Manhole, Survey Ends - 1:10 PM351.3 ft. MGO - General Observation - ROACHES @ MH

Observation photos (11)

  • General Observation - BULKHEAD @ 6 O"CLOCK

    0.1 ft. - General Observation - BULKHEAD @ 6 O"CLOCK

  • General Observation - POSSIBLE MAG COAT 8 TO 4 O'CLOCK

    2 ft. - General Observation - POSSIBLE MAG COAT 8 TO 4 O'CLOCK

  • Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"

    26.6 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"

  • Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"

    49.1 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"

  • Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"

    73.4 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"

  • Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"

    90.7 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"

  • Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"

    175.3 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"

  • Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"

    198.7 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    223.2 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"

    231.6 ft. - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"

  • Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"

    263.5 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"

Observations (25)

DistanceCodeObservation
0.1MGOBULKHEAD @ 6 O"CLOCK
351.3MGOGREASE THROUGHOUT THE REACH
231.6TFC
26.6TFC
303.7TFC
279.4TFC
198.7TFC
2MGOPOSSIBLE MAG COAT 8 TO 4 O'CLOCK
0.1MWM
49.1TFC
351.3AMH1:10 PM
0AMH12:29PM
31.5MGOGREASE 4 TO 8 O'CLOCK
175.3TFC
2SAV
348.2SRV
0.1MGOConn. @ Mh, 3 O' Clock. Active
351.3MGOROACHES @ MH
0.1MWL
263.5TFC
327.6TFC
73.4TFC
223.2SRV
90.7TFC
348.2SAV

Properties (5)

additional_info
U-0618-0703002249
customer
LACSD
datetime
2019-06-28T12:25:17-07:00
documentation
BRAR, FRANKLIN, IGNACIO, RUVALCABA
is_lateral_inspection
false