Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 8, 2017, 09:53 AM
  • 03 0612_03 0611_08022017_015301.mpg

Date
02/08/2017
W/O
622734
Weather
Light Rain
Operator/Surveyor
R.VARGAS
Sewer ID
Z00975
PipeID
P21094
Time
1:53 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4260
Sewer Name
03 ANAHEIM STREET TRUNK CONN @ MAHANNA AV
City
LONG BEACH
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
23
Purpose
Routine Assessment
Project
WO_622734_DISTRICT03_FEB2017
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
03 0612
Downstream MH
03 0611
Dir. of Survey
Downstream
Length Surveyed
320.4 ft.
Total Length
320.4 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2K00
O&M Rating
124
Overall Index
2
Overall Quick
Overall Rating
124
Pipe schematic from manhole 03 0612 to 03 0611
MH: 03 0612MH: 03 0611downstream0 ft. AMH - Upstream Manhole, Survey Begins - 03 06120 ft. MWL - Water Level, 30 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area6.1 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start6.1 ft. MGO - General Observation - MAGNESIUM H.O. START316.2 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish320.4 ft. AMH - Downstream Manhole, Survey Ends - 03 0611

Observation photos (1)

  • Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    6.1 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (7)

DistanceCodeObservation
0AMH03 0612
0MWL
316.2DAGS
320.4AMH03 0611
0MWM
6.1DAGS
6.1MGOMAGNESIUM H.O. START

Properties (7)

additional_info
SC306802
custom_field_two
4
customer
LACSD
datetime
2017-02-08T01:53:01-08:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
35144