Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 8, 2017, 06:18 AM
  • 03 0326_03 0325_07022017_230135.mpg

Date
02/07/2017
W/O
622734
Weather
Light Rain
Operator/Surveyor
R.VARGAS
Sewer ID
Z00359
PipeID
P04900
Time
10:18 PM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4259
Sewer Name
03 ANAHEIM STREET TRUNK
City
LONG BEACH
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
24
Purpose
Routine Assessment
Project
WO_622734_DISTRICT03_FEB2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
03 0326
Downstream MH
03 0325
Dir. of Survey
Downstream
Length Surveyed
6.9 ft.
Total Length
7 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
3
O&M Quick
4121
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
9
Pipe schematic from manhole 03 0326 to 03 0325
MH: 03 0326MH: 03 0325downstream0 ft. AMH - Upstream Manhole, Survey Begins - 03 03260 ft. MWL - Water Level, 40 %of cross sectional area0 ft. MWM - Water Mark, 45 %of cross sectional area2.1 ft. MGO - General Observation - MAGNESIUM H.O. START2.1 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start6.7 ft. MGO - General Observation - MAGNEZIUM H.O. FINISH6.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish6.7 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish7 ft. OBZ - Obstacles Other, 30 %of cross sectional area, from 04 to 08 o'clock - DEBRIS NOT VISIBLE7 ft. MSA - Survey Abandoned - SEVERE DEBRIS 30%

Observation photos (3)

  • Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2.1 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Survey Abandoned - SEVERE DEBRIS 30%

    7 ft. - Survey Abandoned - SEVERE DEBRIS 30%

Observations (11)

DistanceCodeObservation
6.7MGOMAGNEZIUM H.O. FINISH
0AMH03 0326
6.7SAP
7OBZDEBRIS NOT VISIBLE
0MWL
2.1MGOMAGNESIUM H.O. START
7MSASEVERE DEBRIS 30%
2.1DAGS
2.1SAP
0MWM
6.7DAGS

Properties (6)

additional_info
SC306801
custom_field_two
5
customer
LACSD
datetime
2017-02-07T22:18:52-08:00
documentation
PRO PIPE
is_lateral_inspection
false