Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 10, 2017, 05:53 AM
  • F 0253_F 0252 _09052017_222631.mp4

Date
05/09/2017
W/O
630341
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00036
PipeID
P10176
Time
10:53 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K4448
Sewer Name
F JOINT OUTFALL F - UNIT 3A RELIEF
City
CERRITOS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
39
Purpose
Routine Assessment
Project
WO_530341_TV02230_APR2017
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
66 in.
Width
66 in.
Upstream MH
F 0253
Downstream MH
F 0252
Dir. of Survey
Downstream
Length Surveyed
540.3 ft.
Total Length
540.3 ft.
Structural Index
3
Structural Quick
5U3U
Structural Rating
1068
O&M Index
2
O&M Quick
2U00
O&M Rating
216
Overall Index
3
Overall Quick
Overall Rating
1284
Pipe schematic from manhole F 0253 to F 0252
MH: F 0253MH: F 0252downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - F 02532 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start31 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start540.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish540.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish540.3 ft. AMH - Downstream Manhole, Survey Ends - F 0252540.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish540.3 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish

Observation photos (4)

  • Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    31 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
0MWL
2SRV
2DAGS
540.3SSS
0MWM
0AMHF 0253
540.3SAP
540.3AMHF 0252
540.3DAGS
540.3SRV
31SSS
2SAP

Properties (7)

additional_info
SC345223
custom_field_two
2
customer
LACSD
datetime
2017-05-09T22:53:38-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
27333