Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 9, 2017, 08:05 AM
  • Section#8_H 0328_H 0327__892017__G6795.mp4

Date
08/09/2017
W/O
0646404
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00175
PipeID
P10778
Time
1:05 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6795
Sewer Name
H JOINT OUTFALL H - UNIT 4
City
PICO RIVERA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
19A
Purpose
Capital Improvement Program Assesment
Project
20170807MDM_JOINT_OUTFALL_H_UNIT_4
Material
Reinforced Concrete Pipe
Shape
Circular
Height
57 in.
Upstream MH
H 0328
Downstream MH
H 0327
Dir. of Survey
Downstream
Length Surveyed
38.2 ft.
Total Length
38.2 ft.
Structural Index
3
Structural Quick
3500
Structural Rating
15
O&M Index
5
O&M Quick
5100
O&M Rating
5
Overall Index
3
Overall Quick
Overall Rating
20
Pipe schematic from manhole H 0328 to H 0327
MH: H 0328MH: H 0327downstream0 ft. MWM - Water Mark, 80 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 2:25AM0 ft. MWL - Water Level, 50 %of cross sectional area2 ft. MGO - General Observation - MAG COAT 100% 9:00 TO 3:00 START17.5 ft. SAP - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG17.5 ft. MGO - General Observation - MAG COAT 100% FINISH23 ft. SAP - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES - SEVERE AGG38 ft. SAP - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG38.2 ft. AMH - Downstream Manhole, Survey Ends - 2::35AM

Observation photos (4)

  • General Observation - MAG COAT 100% 9:00 TO 3:00 START

    2 ft. - General Observation - MAG COAT 100% 9:00 TO 3:00 START

  • Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    17.5 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES - SEVERE AGG

    23 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG

    38 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG

Observations (9)

DistanceCodeObservation
17.5SAPSEVERE AGG
0MWM
38SAPSEVERE AGG
0AMH2:25AM
23SAPSEVERE AGG
2MGOMAG COAT 100% 9:00 TO 3:00 START
38.2AMH2::35AM
17.5MGOMAG COAT 100% FINISH
0MWL

Properties (6)

custom_field_three
PROJECTING SEVERE AGG
custom_field_two
3
customer
LACSD
datetime
2017-08-09T01:05:28-07:00
documentation
MARTIN,MANANES,REVELES,OLIVER 111
is_lateral_inspection
false