Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 4, 2017, 09:49 PM
Date
12/04/2017
W/O
0674132
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z01090
PipeID
P24494
Time
1:49 PM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6877
Sewer Name
29 ALAMITOS PUMPING PLANT SEWER
City
LONG BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
03
Purpose
Capital Improvement Program Assesment
Project
20171204DF_ALAMITOS_PP_SEWER
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Upstream MH
29 0450
Downstream MH
BLANK
Dir. of Survey
Upstream
Length Surveyed
71.9 ft.
Total Length
71.9 ft.
Structural Index
2
Structural Quick
2B00
Structural Rating
28
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
28
Pipe schematic from manhole 29 0450 to BLANK
MH: 29 0450MH: BLANKupstream0 ft. AMH - Upstream Manhole, Survey Ends - 2:05 PM0.1 ft. SSS - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish0.2 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: YES, 4"3.3 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: YES, 4"69.9 ft. SSS - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Start71.9 ft. AMH - Downstream Manhole, Survey Begins - 1:49 PM71.9 ft. MWM - Water Mark, 10 %of cross sectional area71.9 ft. MWL - Water Level, 5 %of cross sectional area

Observations (8)

DistanceCodeObservation
0AMH1:49 PM
2SSS
71.9AMH2:05 PM
68.6TFC
71.7TFA
71.8SSS
0MWM
0MWL

Properties (4)

custom_field_two
3
customer
LACSD
datetime
2017-12-04T13:49:15-08:00
is_lateral_inspection
false